Quotation within 24 hours  ·  EN 10204 3.1 certificates with every order  ·  Full inspection before shipment
Blog · 2026-07-01

Third-Party Inspection Passed — Planetary Gearbox Components Cleared by TÜV

Third-Party Inspection Passed — Planetary Gearbox Components Cleared by TÜV

Today, we completed a third-party inspection with TÜV on a batch of precision gearbox components, including planet gears, sun gears, and ring gears — destined for planetary gearbox assemblies.


What Was Inspected

The inspection covered a full dimensional and geometric check against customer drawings, including:

Every part was measured on-site, with the TÜV inspector verifying readings against our internal inspection reports — item by item, dimension by dimension.


Why Third-Party Inspection?

Because our customers are global, and trust needs to be earned — not assumed.

Inviting an independent body like TÜV to verify our parts before shipment means our customers receive components that have been checked by a neutral, internationally recognized authority. No surprises at goods receipt. No delays. No disputes.

It's the standard we hold ourselves to — even when no one is asking.


The Result

All parts passed.

The batch is now cleared for shipment.


Need precision gear components with third-party inspection support? We work with TÜV and other internationally recognized inspection bodies. Contact us

Photos in this article

Need these parts made to your drawing? Send your specification — clear quotation within 24 hours, EN 10204 3.1 certificates as standard.

Get a Quotation
Product catalog 2026

All four product lines, in one 12-page catalog

Capabilities, materials, tolerances and quality documents for precision gears, seamless steel tubes, castings and forgings — with machining services and our inspection process. Download the PDF, or ask us for a printed copy.

Download Catalog · PDF 3.4 MB 12 pages · 2026 edition · No registration